New Fortress Energy Places Terminal Gas Sul LNG Terminal in Santa Catarina, Brazil into Operation
TGS is an offshore LNG import terminal with a capacity of approximately 6 MTPA (300 TBtu) and maximum send out of 500 mmscf/day. The terminal includes the Winter FSRU and a 33-kilometer, 20-inch pipeline, which connects the facility to the existing inland
TGS stands as a distinctive and promising prospect for NFE, as it presents a high-growth opportunity for the Company within the Brazilian power and gas markets. The terminal is connected by pipeline to the wider Brazilian gas market, including more than 3.5 GW of power that does not have firm, long-term gas supply contracts and more than 300 TBtu of industrial and residential gas consumers in the south region of
Both power and gas demand are set to substantially increase, while the historical main source of gas supply from
“TGS is directly connected to more than 3.5 GW of existing power infrastructure that lacks firm supply agreements, making the terminal a key asset in Brazil’s evolving energy landscape. With numerous new power projects required to balance the grid in
About
Cautionary Language Regarding Forward-Looking Statements
This communication contains forward-looking statements. All statements contained in this communication other than historical information are forward-looking statements that involve known and unknown risks and relate to future events, our future financial performance or our projected business results. You can identify these forward-looking statements by the use of forward-looking words such as “expects,” “may,” “will,” “predicts,” “intends,” “plans,” “estimates,” “anticipates,” or the negative version of these terms or other comparable words. Forward looking statements include but are not limited to: expectations related to maintenance and repair work of Puerto Rico’s power system and grid; ability to improve grid stability in
These forward-looking statements are necessarily estimates based upon current information and involve a number of risks, uncertainties and other factors, many of which are outside of the Company’s control. Actual results or events may differ materially from the results anticipated in these forward-looking statements. Specific factors that could cause actual results to differ from those in the forward-looking statements include, but are not limited to: unknown and unforeseen risks related to the development, construction or commissioning schedule of the facilities, including failure to meet design and engineering specifications, incompatibility of systems, delays and schedule changes, high costs and expenses, and regulatory and legal challenges, among others; the receipt of permits, approvals and authorizations from governmental and regulatory agencies on a timely basis or at all; we will be unable to operationalize our plans for the projects and derive the benefits expected; common risks related to successful integration of the businesses; breach or failure by the parties to comply with the covenants and obligations under the agreements; nonpayment or nonperformance of obligations by the parties; inability to realize the anticipated benefits from the project or our partnerships; adverse regional, national, or international economic conditions, adverse capital market conditions and adverse political developments; business disruption following the transaction; and the impact of public health crises, such as pandemics (including coronavirus (COVID-19)) and epidemics and any related company or government policies and actions to protect the health and safety of individuals or government policies or actions to maintain the functioning of national or global economies and markets. These factors are not necessarily all of the important factors that could cause actual results to differ materially from those expressed in any of NFE’s forward-looking statements. Other known or unpredictable factors could also have material adverse effects on future results.
Any forward-looking statement speaks only as of the date on which it is made, and we undertake no duty to update or revise these forward-looking statements, even though our situation may change in the future. New factors emerge from time to time, and it is not possible for the Company to predict all such factors. When considering these forward-looking statements, you should keep in mind the risk factors and other cautionary statements included in New Fortress Energy Inc.’s annual and quarterly reports filed with the
View source version on businesswire.com: https://www.businesswire.com/news/home/20240301705741/en/
Investors
ir@newfortressenergy.com
Media
press@newfortressenergy.com
Source: